JaCoW Logo

Reference Search

Author: M. P. Casas Lino


References



Reference
B. Bellesia et al., “Short Circuit Tests: First Step of LHC Hardware Commissioning Completion”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper MOPC103, pp. 304-306.
R. I. Saban et al., “Coordination of the Commissioning of the LHC Technical Systems”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper MOPC118, pp. 340-342.
W. Venturini Delsolaro et al., “Performance of the Superconducting Corrector Magnet Circuits during the Commissioning of the LHC”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPD028, pp. 2470-2472.
A. P. Verweij et al., “Performance of the Main Dipole Magnet Circuits of the LHC during Commissioning”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPD029, pp. 2473-2475.
K. Foraz et al., “Scheduling the Powering Tests”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPP010, pp. 2545-2547.
B. Bellesia et al., “Optimisation of the Powering Tests of the LHC Superconducting Circuits”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper WE6RFP049, pp. 2908-2910.
R. I. Saban et al., “The Commissioning of the LHC Technical Systems”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper FROAC03, pp. 3801-3803.


Back to the list