|
J. Wei et al., “FRIB Project Status and Beam Instrumentation Challenges”, in Proc. 6th Int. Beam Instrumentation Conf. (IBIC'17), Grand Rapids, MI, USA, Aug. 2017, pp. 1-7. |
|
J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 12-20. |
|
J. Wei et al., “Advances of the FRIB Project”, in Proc. 14th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'18), Lanzhou, China, Oct. 2018, pp. 7-12. |
|
J. Wei et al., “FRIB Commissioning and Early Operations”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 802-807. |
|
J. Wei et al., “FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives”, in Proc. 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper MOIAA01, pp. 1-8. |
|
J. Wei et al., “FRIB Beam Power Ramp-up: Status and Plans”, in Proc. HB'23 (HB), Geneva, Switzerland, Oct. 2023, paper THC1I2, pp. 351-357. |
|
T. Ashwarya, M. Ikegami, J. LeTourneau, and A. C. Morton, “Upgrading and Adapting to CS-Studio Phoebus at Facility for Rare Isotope Beams”, in Proc. 19th International Conference on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'23), Cape Town, South Africa, Oct. 2023, paper TUMBCMO11, pp. 364-367. |