|
M. R. Hendricks, T. Krupa, and R. C. Pardo, “Status and Operation of the ATLAS Superconducting Accelerator”, in Proc. 13th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'15), Yokohama, Japan, Sep. 2015, paper WEM1C01, pp. 166-168. |
|
R. C. Pardo et al., “The ATLAS Intensity Upgrade: Project Overview and Online Operating Experience”, in Proc. 13th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'15), Yokohama, Japan, Sep. 2015, paper WEM1C03, pp. 172-174. |
|
B. Mustapha et al., “Pushing the Intensity Envelope at the ATLAS Linac”, in Proc. 13th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'15), Yokohama, Japan, Sep. 2015, paper WEPB05, pp. 200-202. |
|
P. N. Ostroumov et al., “Installation and On-Line Commissioning of EBIS at ATLAS”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 1022-1026. |
|
Y. Luo et al., “PLC Based Flexible and Scalable Vacuum Control at the Argonne Tandem Linear Accelerator System (ATLAS)”, in Proc. 8th Int. Beam Instrumentation Conf. (IBIC'19), Malmö, Sweden, Sep. 2019, pp. 285-287. |
|
B. R. Blomberg et al., “Upgrade and Operation of the ATLAS Radiation Interlock System (ARIS)”, in Proc. 15th International Conference on Heavy Ion Accelerator Technology (HIAT'22), Darmstadt, Germany, Jun.-Jul. 2022, pp. 96-99. |
|
M. P. Kelly et al., “Advances in the ATLAS Accelerator”, presented at the North American Particle Accelerator Conf. (NAPAC'22), Albuquerque, NM, USA, Aug. 2022, paper THZD2, unpublished. |