|
J. Breunlin et al., “Diagnostics at the Max IV 3 GeV Storage Ring During Commissioning”, in Proc. 5th Int. Beam Instrumentation Conf. (IBIC'16), Barcelona, Spain, Sep. 2016, pp. XX-XX. |
|
C. A. Preissner, H. Cease, J. T. Collins, Z. Liu, J. Nudell, and B. N. Jensen, “Nostradamus and the Synchrotron Engineer: Key Aspects of Predicting Accelerator Structural Response”, in Proc. 9th Mechanical Engineering Design of Synchrotron Radiation Equipment and Instrumentation Conf. (MEDSI'16), Barcelona, Spain, Sep. 2016, pp. 272-276. |
|
E. J. Wall?®n, K. I. Blomqvist, B. N. Jensen, and U. Johansson, “Insertion Devices for the MAX IV Light Source”, in Proc. 10th European Particle Accelerator Conf. (EPAC'06), Edinburgh, UK, Jun. 2006, paper THPLS137, pp. 3607-3609. |