|
J. A. Uythoven et al., “Interlock System Upgrades at the CERN Accelerator Complex During Long Shutdown 2”, in Proc. 12th Int. Particle Accelerator Conf. (IPAC'21), Campinas, Brazil, May 2021, pp. 3316-3319. |
|
A. Apollonio et al., “Summary of the Post-Long Shutdown 2 LHC Hardware Commissioning Campaign”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 335-338. |
|
D. Gaßmann et al., “The Personnel Access System for FAIR”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper THPA049, pp. 4067-4069. |
|
S. Yammine et al., “Hardware Commissioning of the HL-LHC Inner Triplet String Facility at CERN: Individual System and Short Circuit Tests”, in Proc. 15th Int. Particle Accelerator Conf. (IPAC'24), Nashville, TN, USA, May 2024, paper THPS50, pp. 3853-3856. |