JaCoW Logo

Reference Search

Author: B. D. Coe


References



Reference
T. Kanesue et al., “Status of the Laser Ion Source Upgrade (LION2) at BNL”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 2087-2089.
T. Kanesue et al., “Automated Operation of EBIS Injector at BNL”, in Proc. 61st ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'18), Daejeon, Korea, Jun. 2018, pp. 153-157.
S. A. Kondrashev et al., “Development of a Compact Linear ZAO NEG Pumping System”, in Proc. 24th International Workshop on ECR Ion Sources (ECRIS'20), East Lansing, MI, USA, Sep. 2020, paper NACB01, pp. 167-171.
K. G. Capobianco-Hogan et al., “Magnetic Cloaking of Charged Particle Beams”, in Proc. North American Particle Accelerator Conf. (NAPAC'16), Chicago, IL, USA, Oct. 2016, pp. 588-591.
E. N. Beebe et al., “Extended EBIS Development at BNL”, presented at the 14th International Symposium of EBIS/T (EBIST2022), Whistler, BC, Canada, Jun. 2022, paper WE2WH01, unpublished.
C. Liu et al., “Summary of the 3-year Beam Energy Scan II operation at RHIC”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 1908-1911.
C. Liu et al., “RHIC Beam Energy Scan Operation with Electron Cooling in 2020”, in Proc. 12th Int. Particle Accelerator Conf. (IPAC'21), Campinas, Brazil, May 2021, pp. 72-75.
C. Liu et al., “Review of the Fixed Target Operation at RHIC in 2020”, in Proc. 12th Int. Particle Accelerator Conf. (IPAC'21), Campinas, Brazil, May 2021, pp. 69-71.
C. Liu et al., “Report of RHIC Beam Operation in 2021”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 1912-1915.


Back to the list