|
R. Miyamoto et al., “Beam Commissioning of Normal Conducting Part and Status of ESS Project”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 18-24. |
|
C. S. Derrez et al., “Wire Scanner Systems at the European Spallation Source (ESS): Tests and First Beam Commissioning Results”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 372-375. |
|
A. G. Sosa et al., “Status of Testing and Commissioning of the Medium Energy Beam Transport Line of the ESS Normal Conducting Linac”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 376-379. |
|
R. Titmarsh, J. F. Esteban M??ller, and J. P. S. Martins, “Synchronous Data Service at the European Spallation Source”, in Proc. 11th Int. Beam Instrumentation Conference (IBIC'22), Kraków, Poland, Sep. 2022, pp. 148-150. |
|
N. Milas, G. S. Fedel, A. A. Gorzawski, J. J. Jamr??z, and J. P. S. Martins, “Commissioning of the Timing System at ESS”, in Proc. 11th Int. Beam Instrumentation Conference (IBIC'22), Kraków, Poland, Sep. 2022, pp. 281-285. |
|
A. A. Gorzawski, J. P. S. Martins, and N. Milas, “EPICS NTTables for Machine Timing Configuration”, in Proc. 19th International Conference on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'23), Cape Town, South Africa, Oct. 2023, paper TUPDP094, pp. 767-771. |
|
F. Chicken, J. J. Jamróz, and J. P. S. Martins, “Development of Standard MicroTCA Deployment at ESS”, in Proc. 19th International Conference on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'23), Cape Town, South Africa, Oct. 2023, paper THMBCMO21, pp. 1238-1241. |
|
G. S. Fedel et al., “LLRF and Timing System Integration at ESS”, in Proc. 19th International Conference on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'23), Cape Town, South Africa, Oct. 2023, paper THPDP051, pp. 1426-1430. |