|
G. Chen, M. Ciubancan, C. Matei, A. Pappalardo, G. Suliman, and C. A. Ur, “The Control System for the ELI-NP Gamma Beam Delivery and Diagnostics”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 521-524. |
|
G. Chen et al., “Development of an EPICS-based control platform for electron beam commissioning at ELI-NP”, in Proc. 20th International Conference on Accelerator and Large Experimental Control Systems (ICALEPCS'25), Chicago, IL, USA, Sep. 2025, pp. 1048-1052. |
|
C. D. Cirdei et al., “Characterization and alignement of LINAC magnets for ELI-GBS facility”, presented at the 17th Int. Particle Accelerator Conf. (IPAC'26), Deauville, France, May 2026, paper TUP7012, this conference. |
|
A.-C. Can et al., “High-Level Applications for LINAC Commissioning at ELI-NP”, presented at the 17th Int. Particle Accelerator Conf. (IPAC'26), Deauville, France, May 2026, paper WEP5127, this conference. |
|
P. Tracz et al., “RF phasing for ELI-GBS linear accelerator”, presented at the 17th Int. Particle Accelerator Conf. (IPAC'26), Deauville, France, May 2026, paper THP2096, this conference. |
|
C. Matei et al., “ELI-NP Gamma-ray Beam System - status update and future”, presented at the 17th Int. Particle Accelerator Conf. (IPAC'26), Deauville, France, May 2026, paper THP2124, this conference. |