|
G. Burt et al., “ERL Related HOM Measurements at ELBE”, in Proc. 41st Advanced ICFA Beam Dynamics Workshop on Energy Recovery Linacs (ERL'07), Daresbury, UK, May 2007, paper 31, pp. 129-132. |
|
W. J. Goscinski et al., “MASSIVE: an HPC Collaboration to Underpin Synchrotron Science”, in Proc. 15th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'15), Melbourne, Australia, Oct. 2015, pp. 640-644. |
|
J. Safranek et al., “SPEAR3 Commissioning”, in Proc. 3rd Asian Particle Accelerator Conf. (APAC'04), Gyeongju, Korea, Mar. 2004, paper MOA102, pp. XX-XX. |
|
P. McIntosh et al., “An Over-Damped Cavity Longitudinal Kicker for the PEP-II LER”, in Proc. 20th Particle Accelerator Conf. (PAC'03), Portland, OR, USA, May 2003, paper RPPB060, pp. 3141-3143. |
|
R. Hettel et al., “SPEAR 3 Upgrade Project: The Final Year”, in Proc. 20th Particle Accelerator Conf. (PAC'03), Portland, OR, USA, May 2003, paper TOPA005, pp. 235-237. |
|
P. McIntosh, A. Hill, and H. Schwarz, “An Automated 476 MHz RF Cavity Processing Facility at SLAC”, in Proc. 20th Particle Accelerator Conf. (PAC'03), Portland, OR, USA, May 2003, paper TPAB035, pp. 1273-1275. |
|
G. Burt et al., “Status of the ILC crab cavity development”, in Proc. 13th Int. Conf. RF Superconductivity (SRF'07), Beijing, China, Oct. 2007, paper WEP42, pp. XX-XX. |