JaCoW Logo

Reference Search

Author: J. Fischer


References



Reference
K. Batchelor et al., “The Brookhaven Accelerator Test Facility”, in Proc. 1988 Linear Accelerator Conf. (LINAC'88), Williamsburg, VA, USA, Oct. 1988, paper TH3-07, pp. 540-543.
K. Batchelor et al., “Operation of the Brookhaven National Laboratory Accelerator Test Facility”, in Proc. 1992 Linear Accelerator Conf. (LINAC'92), Ottawa, Canada, Aug. 1992, paper MO4-48, pp. 178-180.
X. J. Wang, K. Batchelor, I. Ben-Zvi, J. Fischer, and T. Srinivasan-Rao, “Photoelectrons Beam Measurement from a Magnesium Cathode in a RF Electron Gun”, in Proc. 1994 Linear Accelerator Conf. (LINAC'94), Tsukuba, Japan, Aug. 1994, paper TU-19, pp. 407-409.
J. Hogan, E. Daly, J. Fischer, J. Preble, T. Whitlatch, and M. Wiseman, “SNS Cryomodule Production Progress and Key Lessons Learned”, in Proc. 11th Workshop RF Superconductivity (SRF'03), Lübeck, Germany, Sep. 2003, paper TUP33, pp. 382-384.
K. Batchelor et al., “Operational Status of the Brookhaven National Laboratory Accelerator Test Facility”, in Proc. 2nd European Particle Accelerator Conf. (EPAC'90), Nice, France, Jun. 1990, pp. 541-544.
K. Batchelor et al., “Operational Experience on the Brookhaven National Laboratory Accelerator Test Facility”, in Proc. 4th European Particle Accelerator Conf. (EPAC'94), London, UK, Jun.-Jul. 1994, pp. 736-739.
K. Batchelor et al., “Operational Status of the Brookhaven National Laboratory Accelerator Test Facility”, in Proc. 13th Particle Accelerator Conf. (PAC'89), Chicago, IL, USA, Mar. 1989, pp. 273-276.
I. E. Campisi et al., “CEBAF Upgrade Cryomodule Component Testing in the Horizontal Test Bed (HTB)”, in Proc. 19th Particle Accelerator Conf. (PAC'01), Chicago, IL, USA, Jun. 2001, paper MPPH152, pp. 1137-1139.
K. Macha et al., “Alignment of CEBAF Cryomodules”, in Proc. 15th Particle Accelerator Conf. (PAC'93), Washington D.C., USA, Mar. 1993, pp. 2929-2932.


Back to the list