|
S. Pioli et al., “The Turn-key Control System for the ELI-NP Gamma Beam System”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 4091-4093. |
|
T. Krzic, B. Epping, P. Brand, A. Jesenko, T. Zagar, and T. Meglic, “RPI LINAC refurbishment control system engineering plan”, presented at the 15th Int. Particle Accelerator Conf. (IPAC'24), Nashville, TN, USA, May 2024, paper MOPC27, unpublished. |