|
E. Cisbani et al., “Micro Pattern Ionization Chamber with Adaptive Amplifiers as Dose Delivery Monitor for Therapeutic Proton LINAC”, in Proc. 5th Int. Beam Instrumentation Conf. (IBIC'16), Barcelona, Spain, Sep. 2016, pp. 464-467. |
|
L. Picardi, C. Ronsivalle, and S. Frullani, “Advances in TOP Linac Construction”, in Proc. 8th European Particle Accelerator Conf. (EPAC'02), Paris, France, Jun. 2002, paper THBLA001, pp. 248-250. |
|
S. Frullani, G. Messina, A. Mola, L. Picardi, C. Ronsivalle, and A. Vignati, “New Structural Design of SCDTL Structures for the TOP Linac”, in Proc. 6th European Particle Accelerator Conf. (EPAC'98), Stockholm, Sweden, Jun. 1998, paper TUP01G, pp. 2333-2335. |
|
L. Picardi, C. Ronsivalle, R. Hamm, and S. Frullani, “The TOP Project Status”, in Proc. 19th Particle Accelerator Conf. (PAC'01), Chicago, IL, USA, Jun. 2001, paper WPPH021, pp. 2491-2493. |
|
C. R. Frascati, C. Ronsivalle, L. Picardi, and S. Frullani, “Progress in the Development of the TOP Linac”, in Proc. 22nd Linear Accelerator Conf. (LINAC'04), Lübeck, Germany, Aug. 2004, paper THP17, pp. 633-635. |