|
K. B. Buerkmann-Gehrlein et al., “Commissioning of the 100 MeV Racetrack Microtron of the Metrology Light Source”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper TUPMN014, pp. 944-946. |
|
J. Feikes et al., “First Commissioning Results of the Metrology Light Source”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper TUPMN015, pp. 947-949. |
|
E. Weihreter et al., “Instability Studies and Double RF-System Operation at BESSY”, in Proc. 11th Particle Accelerator Conf. (PAC'85), Vancouver, Canada, May 1985, pp. 2317-2320. |
|
P. Kuske, K. Derikum, H. G. Hoberg, and H. Lehr, “Beam Position and Profile Measurements at BESSY”, in Proc. 12th Particle Accelerator Conf. (PAC'87), Washington D.C., USA, Mar. 1987, pp. 535-538. |
|
O. Kugeler et al., “First RF Tests in the HoBiCaT Superconducting Test Facility at BESSY”, in Proc. 10th European Particle Accelerator Conf. (EPAC'06), Edinburgh, UK, Jun. 2006, paper MOPCH148, pp. 402-404. |
|
K. Buerkmann-Gehrlein et al., “Status of the Metrology Light Source”, in Proc. 10th European Particle Accelerator Conf. (EPAC'06), Edinburgh, UK, Jun. 2006, paper THPLS014, pp. 3299-3301. |