|
C. Hovater et al., “Commissioning and Operation Experience with the CEBAF Recirculation Arc Beam Transport System”, in Proc. 15th Particle Accelerator Conf. (PAC'93), Washington D.C., USA, Mar. 1993, pp. 587-590. |
|
G. A. Krafft, D. Douglas, J. Kewisch, M. Bickley, A. Hofler, and B. A. Bowling, “Orbit Correction Implementation at CEBAF”, in Proc. 15th Particle Accelerator Conf. (PAC'93), Washington D.C., USA, Mar. 1993, pp. 1895-1898. |
|
J. R. Delayen et al., “RF Control Modelling Issues for Future Superconducting Accelerators”, in Proc. 22nd Linear Accelerator Conf. (LINAC'04), Lübeck, Germany, Aug. 2004, paper MOP69, pp. 180-182. |
|
C. Hovater, H. Dong, J. Musson, G. Lahti, T. Plawski, and A. Hofler, “A New RF System for the CEBAF Normal Conducting Cavities”, in Proc. 22nd Linear Accelerator Conf. (LINAC'04), Lübeck, Germany, Aug. 2004, paper TUP79, pp. 456-458. |