|
E. Benda et al., “Minimizing Experimental Setup Time and Effort at Aps Beamline 1-Id Through Instrumentation Design”, in Proc. 9th Mechanical Engineering Design of Synchrotron Radiation Equipment and Instrumentation Conf. (MEDSI'16), Barcelona, Spain, Sep. 2016, pp. 353-356. |