|
W. C. Barkley et al., “A Risk Based Approach to Improving Beam Availability at an Accelerator Facility”, in Proc. 29th Linear Accelerator Conf. (LINAC'18), Beijing, China, Sep. 2018, pp. 207-210. |
|
P. K. Roy, E. L. Kerstiens, R. J. Macek, C. Pillai, and C. E. Taylor, “High Energy Beam Transport Along the 68-m LANSCE 1L Beamline to Optimize Neutron Production”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 446-449. |
|
W. C. Barkley et al., “First Results of the Analytical Method Used to Reduce Downtime Risk at an Accelerator Facility”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 4349-4351. |
|
A. D. Walker and E. L. Kerstiens, “1L Target Harp Diagnostic Display Tool”, in Proc. 12th International Beam Instrumentation Conference (IBIC'23), Saskatoon, Canada # e.g. "Barcelona, Spain" or "San Francisco, CA, USA", Sep. 2023, paper MOP033, pp. 99-101. |