|
P. J. S. Barratt et al., “High Stability Operation of the ISIS Pulsed Spallation Neutron Source at 200 micro-A”, in Proc. 5th European Particle Accelerator Conf. (EPAC'96), Sitges, Spain, Jun. 1996, paper TUP094G, pp. 584-586. |
|
U. Bessler, A. Letchford, C. W. Planner, A. Schempp, and H. Vormann, “A New High Duty Factor RFQ Injector for ISIS”, in Proc. 6th European Particle Accelerator Conf. (EPAC'98), Stockholm, Sweden, Jun. 1998, paper MOP22C, pp. 782-784. |
|
B. Brady, C. W. Planner, and A. F. Stevens, “Cathode Modulation of High Power RF Output Triodes of the ISIS Linac”, in Proc. 6th European Particle Accelerator Conf. (EPAC'98), Stockholm, Sweden, Jun. 1998, paper TUP43G, pp. 1909-1911. |
|
H. Vormann, A. Schempp, U. Bessler, A. Letchford, and C. W. Planner, “Design of a High Current RFQ Injector with High Duty Factor”, in Proc. 19th Int. LINAC Conf. (LINAC'98), Chicago, IL, USA, Aug. 1998, paper TH4012, pp. 791-793. |
|
M. R. Harold et al., “A Possible Upgrade for ISIS”, in Proc. 17th Particle Accelerator Conf. (PAC'97), Vancouver, Canada, May 1997, paper 9W024, pp. 1021-1023. |