|
U. Wienands et al., “Beam Commissioning of the PEP-II High Energy Ring”, in Proc. 18th Particle Accelerator Conf. (PAC'99), New York, NY, USA, Mar. 1999, paper THP20, pp. 2993-2995. |
|
W. Barry et al., “Operational Experience with the PEP-II Transverse Coupled-Bunch Feedback Systems”, in Proc. 18th Particle Accelerator Conf. (PAC'99), New York, NY, USA, Mar. 1999, paper TUA55, pp. 1207-1209. |
|
C. Biscari et al., “Single and Multibunch Beam Dynamics in the DA NE Main Rings”, in Proc. 18th Particle Accelerator Conf. (PAC'99), New York, NY, USA, Mar. 1999, paper TUBL3, pp. 131-133. |
|
H. Hindi, S. Prabhakar, J. Fox, and D. Teytelman, “Design and Verification of Controllers for Longitudinal Oscillations Using Optimal Control Theory and Numerical Simulation: Predictions for PEP-II”, in Proc. 17th Particle Accelerator Conf. (PAC'97), Vancouver, Canada, May 1997, paper 6P054, pp. 2362-2364. |
|
D. Teytelman et al., “Control of Multibunch Longitudinal Instabilities and Beam Diagnostics Using a DSP-Based Feedback System”, in Proc. 17th Particle Accelerator Conf. (PAC'97), Vancouver, Canada, May 1997, paper 7PC004, pp. XX-XX. |