|
M. Billing et al., “Measurements of Vacuum Chamber Impedance Effects on the Stored Beam at CESR”, in Proc. 16th Particle Accelerator Conf. (PAC'95), Dallas, TX, USA, May 1995, paper TPA04, pp. 3206-3208. |
|
S. Henderson et al., “CESR Phase III Interaction Region”, in Proc. 18th Particle Accelerator Conf. (PAC'99), New York, NY, USA, Mar. 1999, paper THP113, pp. 3221-3223. |
|
Z. Greenwald and D. L. Rubin, “CESR IV Proposed Transfer Line Design”, in Proc. 18th Particle Accelerator Conf. (PAC'99), New York, NY, USA, Mar. 1999, paper TUA95, pp. 1300-1302. |
|
Z. Greenwald and S. Greenwald, “3-D Numerical Field Calculations of CESR's Upgraded Superconducting Magnets”, in Proc. 17th Particle Accelerator Conf. (PAC'97), Vancouver, Canada, May 1997, paper 8P077, pp. 2547-2549. |
|
Z. Greenwald, S. Greenwald, and D. H. Rice, “REC Quadrupole's Beam Pipe Temperature Control”, in Proc. 17th Particle Accelerator Conf. (PAC'97), Vancouver, Canada, May 1997, paper 9P042, pp. 3705-3707. |
|
M. Tigner and Z. Greenwald, “Synchronous Phase Changes Due to the Gap in the Bunch Train”, in Proc. 15th Particle Accelerator Conf. (PAC'93), Washington D.C., USA, Mar. 1993, pp. 3690-3693. |