JaCoW Logo

Reference Search

Author: F. Rafael


References



Reference
J. Safranek et al., “SPEAR3 Commissioning”, in Proc. 3rd Asian Particle Accelerator Conf. (APAC'04), Gyeongju, Korea, Mar. 2004, paper MOA102, pp. XX-XX.
P. Bellomo et al., “SPEAR 3 DC Magnet Power Supplies - An Overview”, in Proc. 3rd Asian Particle Accelerator Conf. (APAC'04), Gyeongju, Korea, Mar. 2004, paper MOP10004, pp. XX-XX.
A. F. Craievich et al., “LNLS Commissioning and Operation”, in Proc. 5th European Particle Accelerator Conf. (EPAC'96), Sitges, Spain, Jun. 1996, paper WEP085G, pp. 664-666.
A. R. D. Rodrigues et al., “Commissioning and Operations of the Brazilian Synchrotron Light Source”, in Proc. 17th Particle Accelerator Conf. (PAC'97), Vancouver, Canada, May 1997, paper 6V018, pp. 811-813.
R. Keane et al., “Precision current measurement and calibration system for the APS-U unipolar magnet power supplies”, in Proc. 15th Int. Particle Accelerator Conf. (IPAC'24), Nashville, TN, USA, May 2024, paper THPS03, pp. 3726-3728.


Back to the list