JaCoW Logo

Reference Search

Author: G. Carr


References



Reference
K. F. Johnson et al., “Commissioning and Initial Operation of the Isotope Production Facility at the Los Alamos Neutron Science Center”, in Proc. 9th European Particle Accelerator Conf. (EPAC'04), Lucerne, Switzerland, Jul. 2004, paper THPLT153, pp. 2816-2818.
M. S. Gulley et al., “The LANSCE Switchyard Kicker Project”, in Proc. 21st Particle Accelerator Conf. (PAC'05), Knoxville, TN, USA, May 2005, paper MPPT055, pp. 3310-3312.
S. Schaller et al., “The LANSCE RICE Control System Upgrade”, in Proc. 20th Particle Accelerator Conf. (PAC'03), Portland, OR, USA, May 2003, paper WPPE013, pp. 2354-2356.


Back to the list