|
G. W. Wang et al., “The construction of the RF system of BEPC II”, in Proc. 13th Int. Conf. RF Superconductivity (SRF'07), Beijing, China, Oct. 2007, paper WEP44, pp. XX-XX. |
|
R. Miyamoto et al., “Beam Commissioning of Normal Conducting Part and Status of ESS Project”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 18-24. |
|
N. Milas et al., “Beam Tuning Studies in the ESS MEBT”, in Proc. 11th Int. Beam Instrumentation Conference (IBIC'22), Kraków, Poland, Sep. 2022, pp. 6-10. |
|
Y. Levinsen et al., “First RF Phase Scans at the European Spallation Source”, in Proc. 11th Int. Beam Instrumentation Conference (IBIC'22), Kraków, Poland, Sep. 2022, pp. 313-317. |
|
E. Trachanas et al., “Automated Procedure for Conditioning of Normal Conducting Accelerator Cavities”, in Proc. 19th International Conference on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'23), Cape Town, South Africa, Oct. 2023, paper TUPDP080, pp. 699-703. |
|
G. S. Fedel et al., “LLRF and Timing System Integration at ESS”, in Proc. 19th International Conference on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'23), Cape Town, South Africa, Oct. 2023, paper THPDP051, pp. 1426-1430. |