|
E. Asensi Conejero et al., “Commissioning the Control System for Cryomodule Cryogenics Distribution System in Test Stand 2”, in Proc. 17th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'19), New York, NY, USA, Oct. 2019, pp. 204. |
|
R. Miyamoto et al., “First Results of Beam Commissioning on the ESS Site for the Ion Source and Low Energy Beam Transport”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 1118-1121. |
|
C. S. Derrez et al., “Initial Performance of the Beam Instrumentation for the ESS IS & LEBT”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 2650-2653. |
|
D. C. Plostinar et al., “Status of the Normal Conducting Linac at the European Spallation Source”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 2019-2022. |
|
R. Miyamoto et al., “Beam Commissioning of Normal Conducting Part and Status of ESS Project”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 18-24. |
|
C. S. Derrez et al., “Wire Scanner Systems at the European Spallation Source (ESS): Tests and First Beam Commissioning Results”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 372-375. |
|
A. G. Sosa et al., “Status of Testing and Commissioning of the Medium Energy Beam Transport Line of the ESS Normal Conducting Linac”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 376-379. |