JaCoW Logo

Reference Search

Author: E. Daykin


References



Reference
S. Zhao et al., “RF System Experience for FRIB Half Wave Resonators”, in Proc. 20th International Conference on RF Superconductivity (SRF'21), East Lansing, MI, USA, Jun.-Jul. 2021, pp. 226.
S. Zhao et al., “Automation of RF and Cryomodule Operation at FRIB”, in Proc. 15th International Conference on Heavy Ion Accelerator Technology (HIAT'22), Darmstadt, Germany, Jun.-Jul. 2022, pp. 136-139.
J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 12-20.
H. T. Ren et al., “Commissioning Status of the FRIB Front End”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 813-816.
H. Maniar, E. Daykin, D. G. Morris, A. S. Plastun, H. T. Ren, and S. Zhao, “Python Scripts for RF Commissioning at FRIB”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 563-565.
E. Daykin and M. G. Konrad, “Timing, Synchronization and Software-Generated Beam Control at FRIB”, in Proc. 17th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'19), New York, NY, USA, Oct. 2019, pp. 271.


Back to the list