|
N. Pichoff et al., “The SARAF-linac project status”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper TUPM053, pp. 2313-2315. |
|
N. Pichoff et al., “The SARAF-LINAC project status (07/2024)”, presented at the 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, paper THPB013, unpublished. |
|
N. Pichoff et al., “The SARAF-LINAC project July 2024 status”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 615-617. |
|
J. Dumas et al., “SARAF Commissioning: Injector, MEBT and Chopper”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 872-877. |
|
J. Dumas et al., “SARAF beam commissioning results: injector, MEBT”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper TUPA172, pp. 1703-1705. |
|
F. Gougnaud et al., “Evolution Based on MicroTCA and MRF Timing System”, in Proc. 17th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'19), New York, NY, USA, Oct. 2019, pp. 333. |
|
A. Gaget et al., “Machine Protection System at SARAF”, in Proc. 19th International Conference on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'23), Cape Town, South Africa, Oct. 2023, paper THPDP102, pp. 1573-1577. |
|
A. Gaget et al., “EPICS control system for Beam Operation at Saraf Linac Accelerator”, in Proc. 20th International Conference on Accelerator and Large Experimental Control Systems (ICALEPCS'25), Chicago, IL, USA, Sep. 2025, pp. 1822-1827. |