|
I. Mazkiaran, I. Bustinduy, C. de la Cruz, G. Harper, A. Rodr?¡guez P?íramo, and J. P. S. Martins, “ESS MEBT Control System Integration”, in Proc. 17th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'19), New York, NY, USA, Oct. 2019, pp. 420. |
|
A. Rodr?¡guez P?íramo et al., “Design of the ESS MEBT Faraday Cup”, in Proc. 8th Int. Beam Instrumentation Conf. (IBIC'19), Malmö, Sweden, Sep. 2019, pp. 106-110. |
|
I. Bustinduy et al., “The ESS MEBT RF Buncher Cavities Conditioning Process”, in Proc. 12th Int. Particle Accelerator Conf. (IPAC'21), Campinas, Brazil, May 2021, pp. 1107-1109. |
|
D. C. Plostinar et al., “Status of the Normal Conducting Linac at the European Spallation Source”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 2019-2022. |
|
R. Miyamoto et al., “Beam Commissioning of Normal Conducting Part and Status of ESS Project”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 18-24. |
|
C. S. Derrez et al., “Wire Scanner Systems at the European Spallation Source (ESS): Tests and First Beam Commissioning Results”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 372-375. |
|
A. G. Sosa et al., “Status of Testing and Commissioning of the Medium Energy Beam Transport Line of the ESS Normal Conducting Linac”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 376-379. |