|
J. Wei et al., “FRIB Commissioning and Early Operations”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 802-807. |
|
J. Wei et al., “FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives”, in Proc. 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper MOIAA01, pp. 1-8. |
|
J. Wei et al., “FRIB Beam Power Ramp-up: Status and Plans”, in Proc. HB'23 (HB), Geneva, Switzerland, Oct. 2023, paper THC1I2, pp. 351-357. |
|
S. Lidia et al., “Wide dynamic range diagnostics system for primary and secondary beams at FRIB”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 583-588. |
|
J. Wei et al., “FRIB operations: first three years”, in Proc. 16th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'25), East Lansing, MI, USA, Jun. 2025, paper MOX01, pp. 1-7. |
|
M. Smith et al., “Rare-Isotope production with the ARIS separator system at FRIB”, presented at the 16th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'25), East Lansing, MI, USA, Jun. 2025, paper MOP28, unpublished. |
|
D. Kahl et al., “Beam diagnostics in ARIS to investigate wedge defect at FRIB”, in Proc. 16th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'25), East Lansing, MI, USA, Jun. 2025, paper WEP14, pp. 254-257. |