|
J. Wei et al., “FRIB Commissioning and Early Operations”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 802-807. |
|
J. Wei et al., “FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives”, in Proc. 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper MOIAA01, pp. 1-8. |
|
J. Wei et al., “FRIB Beam Power Ramp-up: Status and Plans”, in Proc. HB'23 (HB), Geneva, Switzerland, Oct. 2023, paper THC1I2, pp. 351-357. |
|
S. Yammine et al., “Preparing the commissioning of the HL-LHC superconducting magnet circuits: From the inner triplet string to the CERN accelerator complex”, in Proc. 16th Int. Particle Accelerator Conf. (IPAC'25), Taipei, Taiwan, Jun. 2025, paper WEPB035, pp. 1811-1814. |
|
J. Wei et al., “FRIB operations: first three years”, in Proc. 16th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'25), East Lansing, MI, USA, Jun. 2025, paper MOX01, pp. 1-7. |