|
J. Wei et al., “FRIB Commissioning and Early Operations”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 802-807. |
|
H. J. Son et al., “Status of the High-Current EBIS and ReA EBIT Electron-Gun Upgrade at the Facility for Rare Isotope Beams”, presented at the 14th International Symposium of EBIS/T (EBIST2022), Whistler, BC, Canada, Jun. 2022, paper WE1WH01, unpublished. |
|
J. Wei et al., “FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives”, in Proc. 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper MOIAA01, pp. 1-8. |
|
E. S. Metzgar et al., “Summary of the FRIB Electropolishing Facility Design and Commissioning, Cavity Processing, and Cavity Test Results”, in Proc. 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper TUPTB016, pp. 419-424. |
|
H. J. Son et al., “Status of the High-Current EBIS Charge Breeder for the Facility for Rare Isotope Beams”, in Proc. 24th International Workshop on ECR Ion Sources (ECRIS'20), East Lansing, MI, USA, Sep. 2020, paper NACB02, pp. 172-176. |
|
J. Wei et al., “FRIB Beam Power Ramp-up: Status and Plans”, in Proc. HB'23 (HB), Geneva, Switzerland, Oct. 2023, paper THC1I2, pp. 351-357. |