|
D. C. Plostinar et al., “Status of the Normal Conducting Linac at the European Spallation Source”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 2019-2022. |
|
R. Miyamoto et al., “Beam Commissioning of Normal Conducting Part and Status of ESS Project”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 18-24. |
|
F. Grespan et al., “High Power RF Conditioning of the ESS DTL1”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 356-359. |
|
E. M. Donegani et al., “The Beam Destinations for the Commissioning of the ESS High Power Normal Conducting Linac”, in Proc. HB'23 (HB), Geneva, Switzerland, Oct. 2023, paper FRC1I1, pp. 643-648. |
|
E. Donegani et al., “The four beam destinations for the commissioning of the ESS Normal Conducting Linac”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 151-154. |
|
F. Grespan et al., “ESS DTL: final installation and first commissioning results up to 74 MeV”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 461-464. |
|
F. Grespan et al., “RF and multipacting analysis of the high-power couplers of IFMIF/EVEDA RFQ and ESS DTL”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 457-460. |