|
C. Narug et al., “Successful cleanroom installation of PIP-II SSR2 coupler using robotic arm”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 168-170. |
|
M. Parise, D. Passarelli, and T. Aiazzi, “High pressure rinse simulations for PIP-II SRF cavities”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 202-205. |
|
T. Aiazzi, D. Passarelli, L. Grassellino, and M. Parise, “Fabrication status of production SSR1 jacketed cavities for PIP-II at Fermilab”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 832-835. |
|
B. Giaccone, T. Aiazzi, M. Parise, D. Passarelli, and V. Roger, “Experimental investigation of plasma processing for PIP-II SSR2 cavities”, presented at the 22st International Conference on RF Superconductivity (SRF'25), Tokyo, Japan, Sep. 2025, paper MOP42, unpublished. |
|
D. Longuevergne et al., “First results on plasma cleaning tests in a SSR1-type spoke resonator for PIP-II project at IJCLab”, presented at the 22st International Conference on RF Superconductivity (SRF'25), Tokyo, Japan, Sep. 2025, paper MOP43, unpublished. |
|
L. Grassellino et al., “Preparation and qualification of pre-production SSR2 jacketed cavities for PIP-II”, presented at the 22st International Conference on RF Superconductivity (SRF'25), Tokyo, Japan, Sep. 2025, paper MOP45, unpublished. |