|
I. Podadera et al., “Construction status of the IFMIF-DONES 5 MW linac”, presented at the 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, paper MOPB022, unpublished. |
|
K. Hirosawa et al., “S-parameters live measurement for the multiport RF components: applications to the circulator and the LIPAc RFQ cavity”, in Proc. 16th Int. Particle Accelerator Conf. (IPAC'25), Taipei, Taiwan, Jun. 2025, paper TUPS154, pp. 1648-1650. |
|
L. Gonzalez Gallego Sanchez Camacho et al., “Performance on high-power test bench of RF couplers for the LIPAc’s RFQ”, in Proc. 16th Int. Particle Accelerator Conf. (IPAC'25), Taipei, Taiwan, Jun. 2025, paper WEPB077, pp. 1907-1909. |
|
L. Maindive et al., “Continuous integration on top of the existing control system of LIPAc, for a RF conditioning test bench”, in Proc. 20th International Conference on Accelerator and Large Experimental Control Systems (ICALEPCS'25), Chicago, IL, USA, Sep. 2025, pp. 366-372. |
|
L. Maindive et al., “Continuous integration on top of the existing control system of LIPAc, for a RF conditioning test bench”, presented at the 20th International Conference on Accelerator and Large Experimental Control Systems (ICALEPCS'25), Chicago, IL, USA, Sep. 2025, paper TUPD025, unpublished. |
|
K. Hirosawa et al., “Commissioning status of the RF power source for the LIPAc SRF linac”, presented at the 22st International Conference on RF Superconductivity (SRF'25), Tokyo, Japan, Sep. 2025, paper TUP66, unpublished. |