16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17)
Barcelona, Spain, Oct. 2017
References
|
Reference
|
|
P. B. Miedzik, H. Br?â, T. Hoffmann, A. Reiter, and R. Singh, “A MicroTCA based Beam Position Monitoring System at CRYRING@ESR”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 585-588. |
|
P. Koonpong and R. Rujanakraikarn, “Timing System Using FPGA for Medical Linear Accelerator Prototype at SLRI”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 589-592. |
|
T. G. Lee, J. S. Hong, G. I. Kwon, W. R. Lee, and T. H. Tak, “New Data Acquisition System Implemented Based on MTCA.4 Form Factor for KSTAR Diagnostic System”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 593-596. |
|
N. Hosoda, M. Ishii, T. Ohshima, M. Yamaga, T. Fukui, and A. Gimenez, “Pilot Application of New Control System at SPring-8 RF Test Stand”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 597-600. |
|
W. Zhang et al., “The Timing System of HIRFL-CSR”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 601-603. |
|
J. P. Ricaud, N. Hubert, M. Labat, C. Laulh?â, and H. Enquist, “The TimIQ Synchronization for Sub-Picoseconds Delay Adjustment”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 604-607. |
|
A. Dworak and J. C. Bau, “Decoupling CERN Accelerators”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 608-611. |
|
C. Li et al., “Timing System Upgrade for Top-off Operation of HLS-II”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 612-614. |
|
G. A. Fatkin and A. I. Senchenko, “The Timing Diagram Editing and Verification Method”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 615-617. |
|
J. Cereijo Garc?â, T. Korhonen, and J. H. Lee, “Timing System at ESS”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 618-621. |
Back to the list