JaCoW Logo

Reference Search

Favourites


For Word

[n]	L. Rybarcyk and R. C. McCrady, “Beam-Based Alignment Measurements of the LANSCE Linac”, in Proc. LINAC'04, Lübeck, Germany, Aug. 2004, paper TUP67, pp. 420-422. 
[n]	L. Faillace et al., “Wakefield and HOMs preliminary characterization of the four-quadrant multi-cell RF accelerating structure for the ASTERIX project”, in Proc. IPAC'25, Taipei, Taiwan, Jun. 2025, pp. 2402-2404. doi:10.18429/JACoW-IPAC2025-WEPS088
[n]	D. P. Peterson et al., “CesrTA x-Ray Beam Size Monitor Operation”, in Proc. IPAC'10, Kyoto, Japan, May 2010, paper MOPE090, pp. 1194-1196. 
[n]	V. Talanov, V. Baglin, and T. Wijnands, “Radiation Monitors as a Vacuum Diagnostic in the Room Temperature Parts of the LHC Straight Sections”, in Proc. EPAC'06, Edinburgh, UK, Jun. 2006, paper TUPCH182, pp. 1441-1443. 
[n]	M. Lindroos et al., “A SC Upgrade for the REX-ISOLDE Accelerator at CERN”, in Proc. LINAC'08, Victoria, Canada, Sep.-Oct. 2008, paper MOP028, pp. 124-126. 
[n]	A. Nyul, K. Cwalina, D. K. Kramer, C. Pignard, T. Wijnands, and L. Wright, “Controls Software for the LHC Radiation Monitoring System”, in Proc. ICALEPCS'09, Kobe, Japan, Oct. 2009, paper THP013, pp. 700-702. 
[n]	H. R. Sprenger et al., “Ramp;D Vacuum Issues of the Future GSI Accelerator Facilities”, in Proc. EPAC'04, Lucerne, Switzerland, Jul. 2004, paper WEPKF027, pp. 1657-1659. 
[n]	H.-W. Glock, H. Ecklebe, T. Flisgen, N. Baboi, and P. Zhang, “Diode Down-mixing of HOM Coupler Signals for Beam Position Determination in 1.3-GHz- and 3.9-GHz-Cavities at FLASH”, in Proc. DIPAC'11, Hamburg, Germany, May 2011, paper MOPD25, pp. 101-103. 

For LaTeX

Use Complete Form

For BibTeX

References

Back to search