[n] T. Semba et al., “Manufacture and Assembly of the 6 Meter-Long Cryomodules for Superconducting RF Test Facility (STF) at KEK”, in Proc. PAC'07, Albuquerque, NM, USA, Jun. 2007, paper WEPMN037, pp. 2122-2124.
Use Complete Form
Paper Title: Manufacture and Assembly of the 6 Meter-Long Cryomodules for Superconducting RF Test Facility (STF) at KEK
Paper URL: https://jacow.org/p07/papers/WEPMN037.pdf
Conference: 22nd Particle Accelerator Conf. (PAC'07)
Paper ID: WEPMN037
Location in proceedings: 2122-2124
Original Author String: T. Semba, Y. Itou, S. Kajiura, T. Masumoto, Hitachi Ltd., Ibaraki-ken; S. Noguchi, N. Ohuchi, K. Saito, KEK, Ibaraki; T. Tagawa, Hitachi Ltd., Ibaraki-ken; A. Terashima, K. Tsuchiya, KEK, Ibaraki