|
W. X. Cheng, B. Bacha, B. N. Kosciuk, S. Krinsky, and O. Singh, “Performance of NSLS2 Button BPM”, in Proc. 2nd Int. Beam Instrumentation Conf. (IBIC'13), Oxford, UK, Sep. 2013, paper WEPC09, pp. 678-681. |
|
W. X. Cheng et al., “NSLS2 Diagnostic Systems Commissioning and Measurements”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper MOIZB1, pp. 16-23. |
|
A. J. Della Penna, M. A. Maggipinto, J. Mead, O. Singh, and K. Vetter, “NSLSII Photon Beam Position Monitor ElectronicsTesting and Results”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper MOPF03, pp. 42-44. |
|
Y. Hu, L. R. Dalesio, O. Singh, and H. Xu, “Diagnosing NSLS-II: A New Advanced Synchrotron Light Source”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper MOPF20, pp. 100-102. |
|
D. Padrazo et al., “NSLS-II RF Beam Position Monitor- System Test and Integration”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper TUPF01, pp. 289-293. |
|
W. X. Cheng, B. Bacha, Y. Hu, O. Singh, and H. Xu, “NSLS2 Visible Synchrotron Light Monitor Diagnostic Beamline Commissioning”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper TUPF21, pp. 369-373. |
|
J. Mead et al., “NSLS-II RF Beam Position Monitor Comissioning Update”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper WECYB2, pp. 500-504. |
|
W. X. Cheng, B. Bacha, Y. Hu, O. Singh, H. Xu, and D. Teytelman, “Commissioning of Bunch-by-Bunch Feedback System for NSLS2 Storage Ring”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper WEPD27, pp. 707-711. |
|
W. X. Cheng, B. Bacha, Y. Hu, O. Singh, and G. M. Wang, “NSLS2 Fill Pattern Monitor and Control”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 246-250. |
|
W. X. Cheng, B. Bacha, A. Blednykh, Y. Li, and O. Singh, “Longitudinal Bunch Profile Measurement at NSLS2 Storage Ring”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 251-255. |