|
K. A. Young et al., “Progress Towards the LANSCE RF System Refurbishment”, in Proc. 24th Linear Accelerator Conf. (LINAC'08), Victoria, Canada, Sep.-Oct. 2008, paper THP095, pp. 1011-1011. |
|
K. Hirosawa et al., “Measurements of Momentum Halo Due to the Reduced RFQ Voltage During the LIPAc Beam Commissioning”, in Proc. HB'23 (HB), Geneva, Switzerland, Oct. 2023, paper TUA3I2, pp. 112-117. |
|
S. Kwon et al., “High Beam Current Operation with Beam Diagnostics at LIPAc”, in Proc. HB'23 (HB), Geneva, Switzerland, Oct. 2023, paper FRC1I2, pp. 649-655. |
|
D. Rogind and S. Kwon, “LCLS-II Accelerator Control System Status”, in Proc. 19th International Conference on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'23), Cape Town, South Africa, Oct. 2023, paper MO1BCO03, pp. 12-18. |
|
A. S. Fisher et al., “Commissioning the Beam-Loss Monitoring System of the LCLS Superconducting Linac”, in Proc. 12th International Beam Instrumentation Conference (IBIC'23), Saskatoon, Canada # e.g. "Barcelona, Spain" or "San Francisco, CA, USA", Sep. 2023, paper TUP005, pp. 187-190. |
|
J. Lyles et al., “New concepts for a high power 805 MHz RF amplifier for LANSCE using Gallium Nitride semiconductors”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 238-240. |
|
T. Akagi et al., “Completion of Phase B+ beam commissioning of Linear IFMIF Prototype Accelerator (LIPAc)”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 705-708. |