|
E. Reinfeld et al., “SARAF Beam Lines Control Systems Design”, in Proc. 13th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'11), Grenoble, France, Oct. 2011, paper MOPMS006, pp. 329-332. |
|
I. Eliyahu et al., “Control of the SARAF High Intensity CW Protron Beam Target Systems”, in Proc. 13th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'11), Grenoble, France, Oct. 2011, paper MOPMS008, pp. 336-338. |
|
E. Reinfeld, I. Eliyahu, I. G. Gertz, and I. Mardor, “SARAF Control System Rebuild”, in Proc. 13th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'11), Grenoble, France, Oct. 2011, paper TUCAUST02, pp. 567-569. |
|
D. Berkovits et al., “Operational Experience and Future Goals of the SARAF Linac at SOREQ”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper MO1A01, pp. 100-104. |
|
B. Kaizer, I. Fishman, and I. G. Gertz, “High Power Amplifier Systems for SARAF Phase II”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper TUPB092, pp. 675-677. |
|
A. Kreisel et al., “SARAF Phase-I Proton / Deuteron Linac Beam Operation Status”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper WEIOB02, pp. 770-774. |
|
L. Weissman et al., “The Status of the SARAF Phase-I Linac”, in Proc. 23rd Russian Particle Accelerator Conf. (RuPAC'12), Saint Petersburg, Russia, Sep. 2012, paper WEBCH01, pp. 103-105. |
|
J. Dumas et al., “SARAF Commissioning: Injector, MEBT and Chopper”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 872-877. |