|
T. Kanemura et al., “Liquid Lithium Charge Stripper Commissioning with Heavy Ion Beams and Early Operations of FRIB Strippers”, in Proc. 15th International Conference on Heavy Ion Accelerator Technology (HIAT'22), Darmstadt, Germany, Jun.-Jul. 2022, pp. 31-36. |
|
P. N. Ostroumov et al., “FRIB Commissioning”, in Proc. 15th International Conference on Heavy Ion Accelerator Technology (HIAT'22), Darmstadt, Germany, Jun.-Jul. 2022, pp. 118-123. |
|
A. C. C. Villari et al., “Upgrade of the FRIB ReAccelerator”, in Proc. North American Particle Accelerator Conf. (NAPAC'22), Albuquerque, NM, USA, Aug. 2022, pp. 572-577. |
|
T. Xu et al., “Completion of FRIB Superconducting Linac and Phased Beam Commissioning”, in Proc. 20th International Conference on RF Superconductivity (SRF'21), East Lansing, MI, USA, Jun.-Jul. 2021, pp. 197. |
|
P. Ostroumov et al., “Accelerator and beam physics challenges in support of FRIB experiments”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper TUPA180, pp. 1729-1732. |
|
J. Wei et al., “FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives”, in Proc. 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper MOIAA01, pp. 1-8. |
|
M. Ikegami et al., “Status of Beam Loss Evaluation at J-PARC Linac”, in Proc. 25th Linear Accelerator Conf. (LINAC'10), Tsukuba, Japan, Sep. 2010, paper TUP076, pp. 590-592. |
|
P. N. Ostroumov et al., “FRIB from Commissioning to Operation”, in Proc. HB'23 (HB), Geneva, Switzerland, Oct. 2023, paper MOA1I2, pp. 9-15. |
|
T. Kanemura et al., “Operational Performance with FRIB Liquid Lithium and Carbon Charge Strippers”, presented at the HB'23 (HB), Geneva, Switzerland, Oct. 2023, paper WEC2I2, unpublished. |
|
J. Wei et al., “FRIB Beam Power Ramp-up: Status and Plans”, in Proc. HB'23 (HB), Geneva, Switzerland, Oct. 2023, paper THC1I2, pp. 351-357. |