|
H. T. Ren et al., “Commissioning Status of the FRIB Front End”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 813-816. |
|
S. Zhao et al., “The LLRF Control Design and Validation at FRIB”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 667-669. |
|
J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 12-20. |
|
J. Wei et al., “Advances of the FRIB Project”, in Proc. 14th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'18), Lanzhou, China, Oct. 2018, pp. 7-12. |
|
J. Wei et al., “FRIB Commissioning and Early Operations”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 802-807. |
|
T. Kanemura et al., “Liquid Lithium Charge Stripper Commissioning with Heavy Ion Beams and Early Operations of FRIB Strippers”, in Proc. 15th International Conference on Heavy Ion Accelerator Technology (HIAT'22), Darmstadt, Germany, Jun.-Jul. 2022, pp. 31-36. |
|
P. N. Ostroumov et al., “FRIB Commissioning”, in Proc. 15th International Conference on Heavy Ion Accelerator Technology (HIAT'22), Darmstadt, Germany, Jun.-Jul. 2022, pp. 118-123. |
|
S. Zhao et al., “Automation of RF and Cryomodule Operation at FRIB”, in Proc. 15th International Conference on Heavy Ion Accelerator Technology (HIAT'22), Darmstadt, Germany, Jun.-Jul. 2022, pp. 136-139. |
|
T. Xu et al., “Completion of FRIB Superconducting Linac and Phased Beam Commissioning”, in Proc. 20th International Conference on RF Superconductivity (SRF'21), East Lansing, MI, USA, Jun.-Jul. 2021, pp. 197. |
|
H. T. Ren et al., “FRIB 28 GHz ECR Ion Source Development and Status”, presented at the 24th International Workshop on ECR Ion Sources (ECRIS'20), East Lansing, MI, USA, Sep. 2020, paper MOXZO03, unpublished. |