|
T. Toyama et al., “Beam Diagnostics at the First Beam Commissioning of the J-PARC MR”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper WE4GRC01, pp. 1964-1966. |
|
Y. Funakoshi et al., “Recent Progress of KEKB”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper WE6PFP043, pp. 2588-2590. |
|
K. Shibata, H. Fukuma, S. Hiramatsu, Y. Suetsugu, M. Tejima, and M. Tobiyama, “Study on the Longitudinal Impedance of BPM for KEKB and Super KEKB”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper FRPMN041, pp. 4048-4050. |
|
K. Oide et al., “Compensation of the Crossing Angle with Crab Cavities at KEKB”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper MOZAKI01, pp. 27-31. |
|
H. Koiso et al., “Beam Operation with Crab Cavities at KEKB”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper TUPAN045, pp. 1487-1489. |
|
Y. Kobayashi et al., “PF-Ring and PF-AR Operational Status”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper TUPMN045, pp. 1019-1021. |
|
T. Katoh et al., “Control Computer System for KEK Proton Synchrotron”, in Proc. 7th Particle Accelerator Conf. (PAC'77), Chicago, IL, USA, Mar. 1977, pp. 1789-1792. |
|
T. Ieiri, H. Ishii, Y. Mizumachi, A. Ogata, J.-L. Pellegrin, and M. Tejima, “Beam Diagnostics of the Triastan Accumulation Ring”, in Proc. 10th Particle Accelerator Conf. (PAC'83), Santa Fe, NM, USA, Mar. 1983, pp. 2356-2359. |
|
S. Kamada et al., “Operational Results of Optics Handling and Closed Orbit Correction in the TRISTAN Accumulation Ring”, in Proc. 11th Particle Accelerator Conf. (PAC'85), Vancouver, Canada, May 1985, pp. 2065-2068. |
|
K. Oide et al., “Gamma-Ray Source Using Internal Targets in the TRISTAN Accumulation Ring”, in Proc. 11th Particle Accelerator Conf. (PAC'85), Vancouver, Canada, May 1985, pp. 3415-3418. |