Warning
Some papers have malformed authors, please correct this before using these references.
Favourites
For Word
[n] G. Kube et al., “Tests of the New BPM Long Term Drift Stabilization Scheme Based on External Crossbar Switching at PETRA III”, in Proc. IBIC'21, Pohang, Korea, Sep. 2021, pp. 123-127. doi:10.18429/JACoW-IBIC2021-MOPP30
[n] H. S. Sandberg et al., “Commissioning of Timepix3 Based Beam Gas Ionisation Profile Monitors for the CERN Proton Synchrotron”, in Proc. IBIC'21, Pohang, Korea, Sep. 2021, pp. 172-175. doi:10.18429/JACoW-IBIC2021-TUOA05
[n] S. S. Jin et al., “Simulation of a Quad-Slits Interferometer for Measuring the Transverse Beam Size in HLS-II”, in Proc. IBIC'21, Pohang, Korea, Sep. 2021, pp. 198-200. doi:10.18429/JACoW-IBIC2021-TUPP06
[n] N. Eddy et al., “BPM System for the PIP-II Injector Test Facility”, in Proc. IBIC'21, Pohang, Korea, Sep. 2021, pp. 133-135. doi:10.18429/JACoW-IBIC2021-MOPP33
For LaTeX
Use Complete Form
For BibTeX
References
- G. Kube et al., “Tests of the New BPM Long Term Drift Stabilization Scheme Based on External Crossbar Switching at PETRA III”, in Proc. 10th Int. Beam Instrumentation Conf. (IBIC'21), Pohang, Korea, Sep. 2021, pp. 123-127.
- H. S. Sandberg et al., “Commissioning of Timepix3 Based Beam Gas Ionisation Profile Monitors for the CERN Proton Synchrotron”, in Proc. 10th Int. Beam Instrumentation Conf. (IBIC'21), Pohang, Korea, Sep. 2021, pp. 172-175.
- S. S. Jin et al., “Simulation of a Quad-Slits Interferometer for Measuring the Transverse Beam Size in HLS-II”, in Proc. 10th Int. Beam Instrumentation Conf. (IBIC'21), Pohang, Korea, Sep. 2021, pp. 198-200.
- N. Eddy et al., “BPM System for the PIP-II Injector Test Facility”, in Proc. 10th Int. Beam Instrumentation Conf. (IBIC'21), Pohang, Korea, Sep. 2021, pp. 133-135.
Back to search