Warning
Some papers have malformed authors, please correct this before using these references.
Favourites
For Word
[n] S. Korenev, “Measurements of Beam Current for Relativistic Electrons in Air by Current Transformers”, in Proc. PAC'01, Chicago, IL, USA, Jun. 2001, paper WPAH105, pp. 2332-2334.
[n] C.-x. Wang, ANL, Argonne, “Simulation Study of a Normal-Conducting RF Photoinjector for ERL X-Ray Sources”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper MO6RFP048, pp. 467-469.
[n] D. W. Peterson, V. Bharadwaj, J. Klen, R. Pasquinelli, and R. Webber, “An Improved 1.26 MHz System for the Fermilab Antiproton Accummulator”, in Proc. PAC'89, Chicago, IL, USA, Mar. 1989, pp. 237-240.
[n] H. Al-Mohammad and K. Manukyan, “SESAME Storage Ring Diagnostics and Commissioning”, in Proc. IBIC'17, Grand Rapids, MI, USA, Aug. 2017, pp. 16-20. doi:10.18429/JACoW-IBIC2017-MO2AB3
[n] H. Al-Mohammad and K. Manukyan, “Diagnostics During SESAME Booster Commissioning”, in Proc. IBIC'15, Melbourne, Australia, Sep. 2015, pp. 85-88. doi:10.18429/JACoW-IBIC2015-MOPB022
[n] M. Galonska et al., “The HIT Gantry: From Commissioning to Operation”, in Proc. IPAC'13, Shanghai, China, May 2013, paper THPWA004, pp. 3636-3638.
For LaTeX
Use Complete Form
For BibTeX
References
- S. Korenev, “Measurements of Beam Current for Relativistic Electrons in Air by Current Transformers”, in Proc. 19th Particle Accelerator Conf. (PAC'01), Chicago, IL, USA, Jun. 2001, paper WPAH105, pp. 2332-2334.
- C.-x. Wang, ANL, Argonne, “Simulation Study of a Normal-Conducting RF Photoinjector for ERL X-Ray Sources”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper MO6RFP048, pp. 467-469.
- D. W. Peterson, V. Bharadwaj, J. Klen, R. Pasquinelli, and R. Webber, “An Improved 1.26 MHz System for the Fermilab Antiproton Accummulator”, in Proc. 13th Particle Accelerator Conf. (PAC'89), Chicago, IL, USA, Mar. 1989, pp. 237-240.
- H. Al-Mohammad and K. Manukyan, “SESAME Storage Ring Diagnostics and Commissioning”, in Proc. 6th Int. Beam Instrumentation Conf. (IBIC'17), Grand Rapids, MI, USA, Aug. 2017, pp. 16-20.
- H. Al-Mohammad and K. Manukyan, “Diagnostics During SESAME Booster Commissioning”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 85-88.
- M. Galonska et al., “The HIT Gantry: From Commissioning to Operation”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper THPWA004, pp. 3636-3638.
Back to search