Favourites
For Word
[n] J. C. Schnuriger, “The 40 kA Dumping System for the ISR Beams”, in Proc. PAC'75, Washington D.C., USA, Mar. 1975, pp. 1321-1324.
[n] C. D. Curtis and G. M. Lee, “Preaccelerator Column Design”, in Proc. LINAC'64, Madison, WI, USA, Jul. 1964, paper PART5-5, pp. 487-496.
[n] C. Defrance, J. F. Bergoz, L. Ducimeti?¿re, and E. Vossenberg, “Wideband Current Transformers for the Surveillance of the Beam Extraction Kicker System of the Large Hadron Collider”, in Proc. APAC'07, Indore, India, Jan.-Feb. 2007, paper THPMA078, pp. 746-748.
[n] N. Heurich, W. Hillert, A. Roth, and R. Zimmermann, “A Longitudinal Kicker Cavity for a Bunch-by-bunch Feedback System at ELSA”, in Proc. IPAC'11, San Sebastian, Spain, Sep. 2011, paper MOPO004, pp. 484-486.
[n] B. Keil et al., “Status of The SwissFEL BPM System”, in Proc. IBIC'15, Melbourne, Australia, Sep. 2015, pp. 497-501. doi:10.18429/JACoW-IBIC2015-TUPB065
[n] P. Efthimion, R. C. Davidson, E. P. Gilson, B. G. Logan, P. A. Seidl, and W. L. Waldron, “Multi-Meter-Long Plasma Source for Heavy Ion Beam Charge Neutralization”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper TU6PFP098, pp. 1528-1528.
[n] S. Auch et al., “New Developments for the RFQ-Accelerator of the Heidelberg High Current Injector”, in Proc. EPAC'96, Sitges, Spain, Jun. 1996, paper THP108G, pp. 804-806.
[n] C. D. Curtis et al., “Operation of NAL Linac at Energies to 139 MeV”, in Proc. LINAC'70, Batavia, IL, USA, Sep.-Oct. 1970, paper C-3, pp. 217-238.
[n] L. Haenichen, O. Boine-Frankenheim, W. F. O. M??ller, and T. Weiland, “Coupling Impedance Contribution of Ferrite Devices: Theory and Simulation”, in Proc. IPAC'10, Kyoto, Japan, May 2010, paper TUPEC048, pp. 1829-1831.
[n] A. A. Nosych et al., “Measurements and Calibration of the Stripline BPM for the ELI-NP facility with the Stretched Wire Method”, in Proc. IBIC'15, Melbourne, Australia, Sep. 2015, pp. 423-427. doi:10.18429/JACoW-IBIC2015-TUPB048
[n] U. Iriso, M. Alvarez, F. F. B. Fernandez, A. Olmos, and F. Perez, “Diagnostics during the ALBA Storage Ring Commissioning”, in Proc. DIPAC'11, Hamburg, Germany, May 2011, paper TUOA02, pp. 280-282.
[n] M. Comunian, C. Roncolato, and B. B. Chalykh, “Beam Dynamics of the Linac ALPI-PIAVE in View of Possible Upgrades Scenario for the SPES Project.”, in Proc. LINAC'12, Tel Aviv, Israel, Sep. 2012, paper TUPB032, pp. 546-548.
[n] B. Keil et al., “Status of The European XFEL Transverse Intra Bunch Train Feedback System”, in Proc. IBIC'15, Melbourne, Australia, Sep. 2015, pp. 492-496. doi:10.18429/JACoW-IBIC2015-TUPB064
[n] A. Olmos et al., “Integration of the Diamond Transverse Multibunch Feedback System at ALBA”, in Proc. IBIC'15, Melbourne, Australia, Sep. 2015, pp. 414-417. doi:10.18429/JACoW-IBIC2015-TUPB046
[n] B. Grigoryan et al., “Chromatic and Wakefield Effects in PSI-XFEL Linac”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper THPC004, pp. 2978-2980.
[n] D. Gudkov, M. M. Dehler, J.-Y. Raguin, G. Riddone, A. Samoshkin, and R. Zennaro, “Engineering Design of a Multipurpose X-band Accelerating Structure”, in Proc. IPAC'10, Kyoto, Japan, May 2010, paper THPEA042, pp. 3771-3773.
[n] B. Y. Wang, P. Lu, B. Sun, J. Wang, J. H. Wang, and H. Xu, “Bunch Length Measurement in Time Domain for HLS”, in Proc. PAC'07, Albuquerque, NM, USA, Jun. 2007, paper FRPMN052, pp. 4108-4110.
For LaTeX
Use Complete Form
For BibTeX
References
- J. C. Schnuriger, “The 40 kA Dumping System for the ISR Beams”, in Proc. 6th Particle Accelerator Conf. (PAC'75), Washington D.C., USA, Mar. 1975, pp. 1321-1324.
- C. D. Curtis and G. M. Lee, “Preaccelerator Column Design”, in Proc. 1964 Linear Accelerator Conf. (LINAC'64), Madison, WI, USA, Jul. 1964, paper PART5-5, pp. 487-496.
- C. Defrance, J. F. Bergoz, L. Ducimeti?¿re, and E. Vossenberg, “Wideband Current Transformers for the Surveillance of the Beam Extraction Kicker System of the Large Hadron Collider”, in Proc. 4th Asian Particle Accelerator Conf. (APAC'07), Indore, India, Jan.-Feb. 2007, paper THPMA078, pp. 746-748.
- N. Heurich, W. Hillert, A. Roth, and R. Zimmermann, “A Longitudinal Kicker Cavity for a Bunch-by-bunch Feedback System at ELSA”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper MOPO004, pp. 484-486.
- B. Keil et al., “Status of The SwissFEL BPM System”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 497-501.
- P. Efthimion, R. C. Davidson, E. P. Gilson, B. G. Logan, P. A. Seidl, and W. L. Waldron, “Multi-Meter-Long Plasma Source for Heavy Ion Beam Charge Neutralization”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TU6PFP098, pp. 1528-1528.
- S. Auch et al., “New Developments for the RFQ-Accelerator of the Heidelberg High Current Injector”, in Proc. 5th European Particle Accelerator Conf. (EPAC'96), Sitges, Spain, Jun. 1996, paper THP108G, pp. 804-806.
- C. D. Curtis et al., “Operation of NAL Linac at Energies to 139 MeV”, in Proc. 1970 Linear Accelerator Conf. (LINAC'70), Batavia, IL, USA, Sep.-Oct. 1970, paper C-3, pp. 217-238.
- L. Haenichen, O. Boine-Frankenheim, W. F. O. M??ller, and T. Weiland, “Coupling Impedance Contribution of Ferrite Devices: Theory and Simulation”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper TUPEC048, pp. 1829-1831.
- A. A. Nosych et al., “Measurements and Calibration of the Stripline BPM for the ELI-NP facility with the Stretched Wire Method”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 423-427.
- U. Iriso, M. Alvarez, F. F. B. Fernandez, A. Olmos, and F. Perez, “Diagnostics during the ALBA Storage Ring Commissioning”, in Proc. 10th European Workshop on Beam Diagnostics and Instrumentation for Particle Accelerators (DIPAC'11), Hamburg, Germany, May 2011, paper TUOA02, pp. 280-282.
- M. Comunian, C. Roncolato, and B. B. Chalykh, “Beam Dynamics of the Linac ALPI-PIAVE in View of Possible Upgrades Scenario for the SPES Project.”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper TUPB032, pp. 546-548.
- B. Keil et al., “Status of The European XFEL Transverse Intra Bunch Train Feedback System”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 492-496.
- A. Olmos et al., “Integration of the Diamond Transverse Multibunch Feedback System at ALBA”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 414-417.
- B. Grigoryan et al., “Chromatic and Wakefield Effects in PSI-XFEL Linac”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper THPC004, pp. 2978-2980.
- D. Gudkov, M. M. Dehler, J.-Y. Raguin, G. Riddone, A. Samoshkin, and R. Zennaro, “Engineering Design of a Multipurpose X-band Accelerating Structure”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper THPEA042, pp. 3771-3773.
- B. Y. Wang, P. Lu, B. Sun, J. Wang, J. H. Wang, and H. Xu, “Bunch Length Measurement in Time Domain for HLS”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper FRPMN052, pp. 4108-4110.
Back to search