[n] W. D. Cornelius, “Design and Performance of the Inter-RFQ Beam Transport and Matching Section for the SAIC PET Isotope Production Accelerator”, in Proc. PAC'93, Washington D.C., USA, Mar. 1993, pp. 2994-2997.
[n] W. J. G. M et al., “Beam Loading and Beam Breakup in a 1.3 GHz Microtron Accelerating Cavity”, in Proc. EPAC'92, Berlin, Germany, Mar. 1992, pp. 813-816.
Use Complete Form