Favourites
For Word
[n] H. Tarawneh et al., “General Status of SESAME”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper WEPC055, pp. 2115-2117.
[n] M. M. Shehab and G. Vignola, “Mechanical Design Considerations for Sesame Main Subsystems”, in Proc. PAC'07, Albuquerque, NM, USA, Jun. 2007, paper MOPAN047, pp. 263-265.
[n] D. S. Foudeh, E. Huttel, and N. Kh. Sawai, “The RF System of the SESAME Storage Ring”, in Proc. IPAC'17, Copenhagen, Denmark, May 2017, pp. 4187-4189. doi:10.18429/JACoW-IPAC2017-THPIK041
[n] A. Nadji et al., “Progress Report of SESAME Project”, in Proc. IPAC'10, Kyoto, Japan, May 2010, paper WEOARA02, pp. 2424-2426.
[n] A. P. Lee et al., “Technical Considerations of the TPS Linac”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper WEPC082, pp. 2186-2188.
[n] P. Bastl et al., “Hardware Architecture of the ELI Beamlines Control and DAQ System”, in Proc. ICALEPCS'17, Barcelona, Spain, Oct. 2017, pp. 2000-2006. doi:10.18429/JACoW-ICALEPCS2017-FRAPL05
[n] C. J. Mayer, B. D. Goodrich, and W. McBride, “Commisioning and Calibration of the Daniel K. Inouye Solar Telescope”, in Proc. ICALEPCS'17, Barcelona, Spain, Oct. 2017, pp. 1989-1994. doi:10.18429/JACoW-ICALEPCS2017-FRAPL02
[n] C.-S. Fann, J. P. Chiou, K.-B. Liu, and J.-T. Sheu, “Simulation of Kicker Pulser with Matlab Simulink”, in Proc. PAC'01, Chicago, IL, USA, Jun. 2001, paper FPAH037, pp. 3753-3755.
[n] X. Serra-Gallifa et al., “Harmony: A Generic FPGA Based Solution for Flexible Feedback Systems”, in Proc. PCaPAC'16, Campinas, Brazil, Oct. 2016, pp. 141-144. doi:10.18429/JACoW-PCAPAC2016-FRFMPLCO06
[n] B. S. Wang, C. H. Huang, J. C. Huang, C. Y. Liu, K.-B. Liu, and Y. S. Wong, “Improvement the Bending Magnet Power Supply Performance for TPS Storage Ring”, in Proc. IPAC'19, Melbourne, Australia, May 2019, pp. 1353-1355. doi:10.18429/JACoW-IPAC2019-TUPMP046
[n] G. Vignola et al., “SESAME Status”, in Proc. APAC'07, Indore, India, Jan.-Feb. 2007, paper THC3MA02, pp. 610-612.
[n] T. Straumann et al., “New Controls Platform for SLAC High-Performance Systems”, in Proc. PCaPAC'16, Campinas, Brazil, Oct. 2016, pp. 72-74. doi:10.18429/JACoW-PCAPAC2016-THHWPLCO02
[n] Y. S. Wong, J. C. Huang, C. Y. Liu, K.-B. Liu, and B. S. Wang, “Modification of a Power Supply for Low-Alpha Operation in the Taiwan Photon Source”, in Proc. IPAC'18, Vancouver, Canada, Apr.-May 2018, pp. 3766-3768. doi:10.18429/JACoW-IPAC2018-THPAL054
[n] Ch. Wang et al., “Operational Performance of the Taiwan Light Source”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper WEPC058, pp. 2124-2126.
For LaTeX
Use Complete Form
For BibTeX
References
- H. Tarawneh et al., “General Status of SESAME”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPC055, pp. 2115-2117.
- M. M. Shehab and G. Vignola, “Mechanical Design Considerations for Sesame Main Subsystems”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper MOPAN047, pp. 263-265.
- D. S. Foudeh, E. Huttel, and N. Kh. Sawai, “The RF System of the SESAME Storage Ring”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 4187-4189.
- A. Nadji et al., “Progress Report of SESAME Project”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper WEOARA02, pp. 2424-2426.
- A. P. Lee et al., “Technical Considerations of the TPS Linac”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPC082, pp. 2186-2188.
- P. Bastl et al., “Hardware Architecture of the ELI Beamlines Control and DAQ System”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 2000-2006.
- C. J. Mayer, B. D. Goodrich, and W. McBride, “Commisioning and Calibration of the Daniel K. Inouye Solar Telescope”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 1989-1994.
- C.-S. Fann, J. P. Chiou, K.-B. Liu, and J.-T. Sheu, “Simulation of Kicker Pulser with Matlab Simulink”, in Proc. 19th Particle Accelerator Conf. (PAC'01), Chicago, IL, USA, Jun. 2001, paper FPAH037, pp. 3753-3755.
- X. Serra-Gallifa et al., “Harmony: A Generic FPGA Based Solution for Flexible Feedback Systems”, in Proc. 11th Int. Workshop on Personal Computers and Particle Accelerator Controls (PCaPAC'16), Campinas, Brazil, Oct. 2016, pp. 141-144.
- B. S. Wang, C. H. Huang, J. C. Huang, C. Y. Liu, K.-B. Liu, and Y. S. Wong, “Improvement the Bending Magnet Power Supply Performance for TPS Storage Ring”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 1353-1355.
- G. Vignola et al., “SESAME Status”, in Proc. 4th Asian Particle Accelerator Conf. (APAC'07), Indore, India, Jan.-Feb. 2007, paper THC3MA02, pp. 610-612.
- T. Straumann et al., “New Controls Platform for SLAC High-Performance Systems”, in Proc. 11th Int. Workshop on Personal Computers and Particle Accelerator Controls (PCaPAC'16), Campinas, Brazil, Oct. 2016, pp. 72-74.
- Y. S. Wong, J. C. Huang, C. Y. Liu, K.-B. Liu, and B. S. Wang, “Modification of a Power Supply for Low-Alpha Operation in the Taiwan Photon Source”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 3766-3768.
- Ch. Wang et al., “Operational Performance of the Taiwan Light Source”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPC058, pp. 2124-2126.
Back to search