Warning
Some papers have malformed authors, please correct this before using these references.
Favourites
For Word
[n] W. X. Cheng, B. Bacha, and O. Singh, “NSLS2 Beam Position Monitor Calibration”, in Proc. BIW'12, Newport News, VA, USA, Apr. 2012, paper MOPG022, pp. 77-79.
[n] W. Singer et al., “Development of Large Grain Superconducting Resonators for the European XFEL”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper TU5PFP054, pp. 947-949.
[n] Y. Nosochkov et al., “Optics Design for FACET”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper WE6PFP080, pp. 2685-2687.
[n] W. X. Cheng, B. Bacha, Y. Hu, O. Singh, and H. Xu, “NSLS2 Visible Synchrotron Light Monitor Diagnostic Beamline Commissioning”, in Proc. IBIC'14, Monterey, CA, USA, Sep. 2014, paper TUPF21, pp. 369-373.
[n] E. Vogel et al., “Integration of the European XFEL Accelerating Modules”, in Proc. LINAC'12, Tel Aviv, Israel, Sep. 2012, paper MOPB017, pp. 207-209.
[n] E. Barbero and F. Rodriguez-Mateos, “Hardware Commissioning of the LHC Quality Assurance Follow-up and Storing of the Test Results”, in Proc. ICALEPCS'05, Geneva, Switzerland, Oct. 2005, paper P1_064.
[n] W. J. Corbett, W. X. Cheng, A. S. Fisher, and X. Huang, “Bunch Length and Impedance Measurements at SPEAR3”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper TUPP028, pp. 1595-1597.
[n] W. X. Cheng, B. Bacha, A. Blednykh, Y. Li, and O. Singh, “Longitudinal Bunch Profile Measurement at NSLS2 Storage Ring”, in Proc. IBIC'15, Melbourne, Australia, Sep. 2015, pp. 251-255. doi:10.18429/JACoW-IBIC2015-MOPB083
[n] R.Keitel, “EdlBuild - Display Generation for the EPICS edm Display Manager”, in Proc. ICALEPCS'05, Geneva, Switzerland, Oct. 2005, paper P3_078.
[n] N. S. Azaryan et al., “Dubna-Minsk SRF Technology Development Status Report”, in Proc. IPAC'13, Shanghai, China, May 2013, paper WEPWO042, pp. 2393-2395.
[n] W. X. Cheng and T. Obina, “Multi-bunch Feedback Activities at Photon Factory Advanced Ring”, in Proc. APAC'07, Indore, India, Jan.-Feb. 2007, paper WEC3H101, pp. 330-332.
[n] W. X. Cheng, W. J. Corbett, and A. S. Fisher, “Streak-Camera Measurements with High Currents in PEP-II and Variable Optics in SPEAR3”, in Proc. BIW'08, Lake Tahoe, CA, USA, May 2008, paper TUPTPF019, pp. 133-137.
[n] W. Singer et al., “Preparation Phase for the 1.3 GHz Cavity Production of the European XFEL”, in Proc. IPAC'10, Kyoto, Japan, May 2010, paper THOARA02, pp. 3633-3635.
[n] W. X. Cheng, “NSLS2 Transverse Feedback System Design”, in Proc. BIW'10, Santa Fe, NM, USA, May 2010, paper TUPSM109, pp. 473-477.
[n] L. Hagge, J. A. Dammann, J. Iversen, J. Kreutzkamp, and W. Singer, “Towards PLM-based Quality Assurance in the Fabrication of the Superconducting Cavities for the European XFEL”, in Proc. IPAC'10, Kyoto, Japan, May 2010, paper WEPEC006, pp. 2899-2901.
For LaTeX
Use Complete Form
For BibTeX
References
- W. X. Cheng, B. Bacha, and O. Singh, “NSLS2 Beam Position Monitor Calibration”, in Proc. 15th Beam Instrumentation Workshop (BIW'12), Newport News, VA, USA, Apr. 2012, paper MOPG022, pp. 77-79.
- W. Singer et al., “Development of Large Grain Superconducting Resonators for the European XFEL”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TU5PFP054, pp. 947-949.
- Y. Nosochkov et al., “Optics Design for FACET”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper WE6PFP080, pp. 2685-2687.
- W. X. Cheng, B. Bacha, Y. Hu, O. Singh, and H. Xu, “NSLS2 Visible Synchrotron Light Monitor Diagnostic Beamline Commissioning”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper TUPF21, pp. 369-373.
- E. Vogel et al., “Integration of the European XFEL Accelerating Modules”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper MOPB017, pp. 207-209.
- E. Barbero and F. Rodriguez-Mateos, “Hardware Commissioning of the LHC Quality Assurance Follow-up and Storing of the Test Results”, in Proc. 10th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'05), Geneva, Switzerland, Oct. 2005, paper P1_064.
- W. J. Corbett, W. X. Cheng, A. S. Fisher, and X. Huang, “Bunch Length and Impedance Measurements at SPEAR3”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper TUPP028, pp. 1595-1597.
- W. X. Cheng, B. Bacha, A. Blednykh, Y. Li, and O. Singh, “Longitudinal Bunch Profile Measurement at NSLS2 Storage Ring”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 251-255.
- R.Keitel, “EdlBuild - Display Generation for the EPICS edm Display Manager”, in Proc. 10th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'05), Geneva, Switzerland, Oct. 2005, paper P3_078.
- N. S. Azaryan et al., “Dubna-Minsk SRF Technology Development Status Report”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper WEPWO042, pp. 2393-2395.
- W. X. Cheng and T. Obina, “Multi-bunch Feedback Activities at Photon Factory Advanced Ring”, in Proc. 4th Asian Particle Accelerator Conf. (APAC'07), Indore, India, Jan.-Feb. 2007, paper WEC3H101, pp. 330-332.
- W. X. Cheng, W. J. Corbett, and A. S. Fisher, “Streak-Camera Measurements with High Currents in PEP-II and Variable Optics in SPEAR3”, in Proc. 13th Beam Instrumentation Workshop (BIW'08), Lake Tahoe, CA, USA, May 2008, paper TUPTPF019, pp. 133-137.
- W. Singer et al., “Preparation Phase for the 1.3 GHz Cavity Production of the European XFEL”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper THOARA02, pp. 3633-3635.
- W. X. Cheng, “NSLS2 Transverse Feedback System Design”, in Proc. 14th Beam Instrumentation Workshop (BIW'10), Santa Fe, NM, USA, May 2010, paper TUPSM109, pp. 473-477.
- L. Hagge, J. A. Dammann, J. Iversen, J. Kreutzkamp, and W. Singer, “Towards PLM-based Quality Assurance in the Fabrication of the Superconducting Cavities for the European XFEL”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper WEPEC006, pp. 2899-2901.
Back to search