Favourites
For Word
[n] T. S. Dascalu et al., “Second Beam Test and Numerical Investigation of the Imperial College Plasma (Gabor) Lens Prototype”, in Proc. IPAC'21, Campinas, Brazil, May 2021, pp. 2943-2946. doi:10.18429/JACoW-IPAC2021-WEPAB140
[n] A. A. Rawankar et al., “Pulsed Green Laser Wire System for Effective Inverse Compton Scattering”, in Proc. IBIC'14, Monterey, CA, USA, Sep. 2014, paper TUCYB2, pp. 254-258.
[n] M. Bitossi, A. Gennai, and D. Passuello, “A/D and D/A Processing Unit for Real Time Control of Suspended Masses in Advanced Virgo Interferometer”, in Proc. ICALEPCS'19, New York, NY, USA, Oct. 2019, pp. 1099. doi:10.18429/JACoW-ICALEPCS2019-WEPHA016
[n] K. H. Hsu, C. K. Kuan, W. Y. Lai, and H. S. Wang, “Vibration Monitoring at TPS Storage Ring”, in Proc. MEDSI'18, Paris, France, Jun. 2018, pp. 227-230. doi:10.18429/JACoW-MEDSI2018-WEPH13
[n] E. Syresin et al., “Electron Cooling in NICA Acceleration Complex”, in Proc. COOL2023, Montreux, Switzerland, Oct. 2023, pp. 109-113. doi:10.18429/JACoW-COOL2023-FRPAM1R2
[n] I. C. Sheng, “A Note of Thermal Analysis in Synchrotron Radiation Accelerator Engineering”, in Proc. MEDSI'18, Paris, France, Jun. 2018, pp. 264-266. doi:10.18429/JACoW-MEDSI2018-WEPH28
[n] G. Olea and N. Huber, “A Family of Redundant Positioning Devices for Synchrotron Applications”, in Proc. MEDSI'18, Paris, France, Jun. 2018, pp. 249-251. doi:10.18429/JACoW-MEDSI2018-WEPH21
[n] S. Khan et al., “SPEED: Worldwide first EEHG implementation at a storage ring”, in Proc. IPAC'23, Venice, Italy, May 2023, pp. 1057-1060. doi:10.18429/JACoW-IPAC2023-MOPM032
[n] H.-G. Lee et al., “Adjusting Mechanism of Inter-Undulator Section for PAL XFEL”, in Proc. MEDSI'18, Paris, France, Jun. 2018, pp. 241-244. doi:10.18429/JACoW-MEDSI2018-WEPH17
[n] D. Xiang and G. V. Stupakov, “Echo-Seeding Options for LCLS-II”, in Proc. FEL'10, Malmö, Sweden, Aug. 2010, paper TUPB13, pp. 282-285.
[n] S. Fujishima, A. Goto, T. Mitsumoto, H. Okuno, T. Tominaka, and Y. Yano, “Analysis of the Injection and Extraction Trajectories in the RIKEN Superconducting Ring Cyclotron”, in Proc. Cyclotrons'98, Caen, France, Jun. 1998, paper G-10, pp. 485-488.
[n] B. Podobedov and G. V. Stupakov, “New Method for Point-Charge Wakefield Calculation”, in Proc. NAPAC'13, Pasadena, CA, USA, Sep.-Oct. 2013, paper WEODB1, pp. 778-780.
[n] L. Xiao, F. Caspers, C.-K. Ng, and J. C. Smith, “Trapped Mode Study for a Rotatable Collimator Design for the LHC Upgrade”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper TH5PFP089, pp. 3416-3418.
[n] N. Sakamoto, A. Goto, O. Kamigaito, T. Mitsumoto, H. Okuno, and Y. Yano, “Design of the RF Resonators for the New Booster Ring Cyclotrons in the RIKEN RI Beam Factory”, in Proc. Cyclotrons'98, Caen, France, Jun. 1998, paper B-19, pp. 223-226.
[n] H. Calen, C. Ekstrom, S. Kullander, and D. Reistad, “CELSIUS as an Eta Factory”, in Proc. EPAC'96, Sitges, Spain, Jun. 1996, paper TUP107G, pp. 873-875.
[n] J.-C. Chang, Y.-C. Chung, C.-Y. Liu, and Z.-D. Tsai, “Air Temperature Analysis and Control Improvement for the EPU 5.6 at TLS”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper TUPC128, pp. 1368-1370.
For LaTeX
Use Complete Form
For BibTeX
References
- T. S. Dascalu et al., “Second Beam Test and Numerical Investigation of the Imperial College Plasma (Gabor) Lens Prototype”, in Proc. 12th Int. Particle Accelerator Conf. (IPAC'21), Campinas, Brazil, May 2021, pp. 2943-2946.
- A. A. Rawankar et al., “Pulsed Green Laser Wire System for Effective Inverse Compton Scattering”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper TUCYB2, pp. 254-258.
- M. Bitossi, A. Gennai, and D. Passuello, “A/D and D/A Processing Unit for Real Time Control of Suspended Masses in Advanced Virgo Interferometer”, in Proc. 17th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'19), New York, NY, USA, Oct. 2019, pp. 1099.
- K. H. Hsu, C. K. Kuan, W. Y. Lai, and H. S. Wang, “Vibration Monitoring at TPS Storage Ring”, in Proc. 10th Mechanical Engineering Design of Synchrotron Radiation Equipment and Instrumentation Conf. (MEDSI'18), Paris, France, Jun. 2018, pp. 227-230.
- E. Syresin et al., “Electron Cooling in NICA Acceleration Complex”, in Proc. 14th International Workshop on Beam Cooling and Related Topics (COOL2023), Montreux, Switzerland, Oct. 2023, paper FRPAM1R2, pp. 109-113.
- I. C. Sheng, “A Note of Thermal Analysis in Synchrotron Radiation Accelerator Engineering”, in Proc. 10th Mechanical Engineering Design of Synchrotron Radiation Equipment and Instrumentation Conf. (MEDSI'18), Paris, France, Jun. 2018, pp. 264-266.
- G. Olea and N. Huber, “A Family of Redundant Positioning Devices for Synchrotron Applications”, in Proc. 10th Mechanical Engineering Design of Synchrotron Radiation Equipment and Instrumentation Conf. (MEDSI'18), Paris, France, Jun. 2018, pp. 249-251.
- S. Khan et al., “SPEED: Worldwide first EEHG implementation at a storage ring”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper MOPM032, pp. 1057-1060.
- H.-G. Lee et al., “Adjusting Mechanism of Inter-Undulator Section for PAL XFEL”, in Proc. 10th Mechanical Engineering Design of Synchrotron Radiation Equipment and Instrumentation Conf. (MEDSI'18), Paris, France, Jun. 2018, pp. 241-244.
- D. Xiang and G. V. Stupakov, “Echo-Seeding Options for LCLS-II”, in Proc. 32nd Int. Free Electron Laser Conf. (FEL'10), Malmö, Sweden, Aug. 2010, paper TUPB13, pp. 282-285.
- S. Fujishima, A. Goto, T. Mitsumoto, H. Okuno, T. Tominaka, and Y. Yano, “Analysis of the Injection and Extraction Trajectories in the RIKEN Superconducting Ring Cyclotron”, in Proc. 15th Int. Cyclotron Conf. and Their Applications (Cyclotrons'98), Caen, France, Jun. 1998, paper G-10, pp. 485-488.
- B. Podobedov and G. V. Stupakov, “New Method for Point-Charge Wakefield Calculation”, in Proc. North American Particle Accelerator Conf. (NAPAC'13), Pasadena, CA, USA, Sep.-Oct. 2013, paper WEODB1, pp. 778-780.
- L. Xiao, F. Caspers, C.-K. Ng, and J. C. Smith, “Trapped Mode Study for a Rotatable Collimator Design for the LHC Upgrade”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TH5PFP089, pp. 3416-3418.
- N. Sakamoto, A. Goto, O. Kamigaito, T. Mitsumoto, H. Okuno, and Y. Yano, “Design of the RF Resonators for the New Booster Ring Cyclotrons in the RIKEN RI Beam Factory”, in Proc. 15th Int. Cyclotron Conf. and Their Applications (Cyclotrons'98), Caen, France, Jun. 1998, paper B-19, pp. 223-226.
- H. Calen, C. Ekstrom, S. Kullander, and D. Reistad, “CELSIUS as an Eta Factory”, in Proc. 5th European Particle Accelerator Conf. (EPAC'96), Sitges, Spain, Jun. 1996, paper TUP107G, pp. 873-875.
- J.-C. Chang, Y.-C. Chung, C.-Y. Liu, and Z.-D. Tsai, “Air Temperature Analysis and Control Improvement for the EPU 5.6 at TLS”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper TUPC128, pp. 1368-1370.
Back to search