Favourites
For Word
[n] R. Miyamoto et al., “Beam Commissioning of Normal Conducting Part and Status of ESS Project”, in Proc. LINAC'22, Liverpool, UK, Aug.-Sep. 2022, pp. 18-24. doi:10.18429/JACoW-LINAC2022-MO1PA02
[n] M. Tomizawa et al., “Tracking error analysis on the power supply currents of J-PARC main ring main magnets”, in Proc. IPAC'24, Nashville, TN, USA, May 2024, pp. 1665-1668. doi:10.18429/JACoW-IPAC2024-TUPS14
[n] Y. Irie et al., “Low-Output-Impedance RF System for the ISIS Second Harmonic Cavity”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper MOPC119, pp. 343-345.
For LaTeX
Use Complete Form
For BibTeX
References
- R. Miyamoto et al., “Beam Commissioning of Normal Conducting Part and Status of ESS Project”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 18-24.
- M. Tomizawa et al., “Tracking error analysis on the power supply currents of J-PARC main ring main magnets”, in Proc. 15th Int. Particle Accelerator Conf. (IPAC'24), Nashville, TN, USA, May 2024, paper TUPS14, pp. 1665-1668.
- Y. Irie et al., “Low-Output-Impedance RF System for the ISIS Second Harmonic Cavity”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper MOPC119, pp. 343-345.
Back to search