Warning
Some papers have malformed authors, please correct this before using these references.
Favourites
For Word
[n] D. M. Gassner et al., “Conceptual Design Overview of the Electron Ion Collider Instrumentation”, in Proc. IBIC'21, Pohang, Korea, Sep. 2021, pp. 30-34. doi:10.18429/JACoW-IBIC2021-MOPP04
[n] V. Auslender et al., “Industrial Electron Accelerators Type ILU”, in Proc. PAC'05, Knoxville, TN, USA, May 2005, paper RPAP017, pp. 1572-1574.
[n] Y. Jiao et al., “Progress of physics studies and beam commissioning of the High Energy Photon Source”, in Proc. IPAC'24, Nashville, TN, USA, May 2024, pp. 1290-1293. doi:10.18429/JACoW-IPAC2024-TUPG31
[n] S. V. Milton, “Measurements of Exponential Gain and Saturation of SASE at the APS LEUTL”, in Proc. PAC'01, Chicago, IL, USA, Jun. 2001, paper TOPA007, pp. 236-240.
[n] A. Saini and A. V. Shemyakin, “Optical Design of the PI-Test MEBT Beam Scraping System”, in Proc. LINAC'16, East Lansing, MI, USA, Sep. 2016, pp. 827-829. doi:10.18429/JACoW-LINAC2016-THPRC026
[n] A. K?ñllberg et al., “Commissioning of the Double Electrostatic Storage Ring DESIREE”, in Proc. IPAC'14, Dresden, Germany, Jun. 2014, pp. 373-375. doi:10.18429/JACoW-IPAC2014-MOPME001
[n] F. Valentini, T. Ladzinski, P. Ninin, and L. Scibile, “Safety Testing for LHC Access System”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper MOPD037, pp. 532-534.
[n] C. Di Giulio, B. Buonomo, F. Cardelli, D. Di Giovenale, and L. G. Foggetta, “The Frascati Beam Test Facility New Line: From Design to Beam Commissioning.”, in Proc. IBIC'21, Pohang, Korea, Sep. 2021, pp. 35-39. doi:10.18429/JACoW-IBIC2021-MOPP05
[n] H. H. Yan et al., “A Design of Switch Magnet Power Supply”, in Proc. Cyclotrons'10, Lanzhou, China, Sep. 2010, paper MOPCP107, pp. 266-268.
For LaTeX
Use Complete Form
For BibTeX
References
- D. M. Gassner et al., “Conceptual Design Overview of the Electron Ion Collider Instrumentation”, in Proc. 10th Int. Beam Instrumentation Conf. (IBIC'21), Pohang, Korea, Sep. 2021, pp. 30-34.
- V. Auslender et al., “Industrial Electron Accelerators Type ILU”, in Proc. 21st Particle Accelerator Conf. (PAC'05), Knoxville, TN, USA, May 2005, paper RPAP017, pp. 1572-1574.
- Y. Jiao et al., “Progress of physics studies and beam commissioning of the High Energy Photon Source”, in Proc. 15th Int. Particle Accelerator Conf. (IPAC'24), Nashville, TN, USA, May 2024, paper TUPG31, pp. 1290-1293.
- S. V. Milton, “Measurements of Exponential Gain and Saturation of SASE at the APS LEUTL”, in Proc. 19th Particle Accelerator Conf. (PAC'01), Chicago, IL, USA, Jun. 2001, paper TOPA007, pp. 236-240.
- A. Saini and A. V. Shemyakin, “Optical Design of the PI-Test MEBT Beam Scraping System”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 827-829.
- A. K?ñllberg et al., “Commissioning of the Double Electrostatic Storage Ring DESIREE”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 373-375.
- F. Valentini, T. Ladzinski, P. Ninin, and L. Scibile, “Safety Testing for LHC Access System”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper MOPD037, pp. 532-534.
- C. Di Giulio, B. Buonomo, F. Cardelli, D. Di Giovenale, and L. G. Foggetta, “The Frascati Beam Test Facility New Line: From Design to Beam Commissioning.”, in Proc. 10th Int. Beam Instrumentation Conf. (IBIC'21), Pohang, Korea, Sep. 2021, pp. 35-39.
- H. H. Yan et al., “A Design of Switch Magnet Power Supply”, in Proc. 19th Int. Conf. on Cyclotrons and their Applications (Cyclotrons'10), Lanzhou, China, Sep. 2010, paper MOPCP107, pp. 266-268.
Back to search